中文版 丨 English 丨 收藏本站 丨 關(guān)于天力
作者:管理員 發(fā)布于:2017-03-28
除鐵機(jī)檢修注意事項(xiàng):
Considerations for maintenance of iron removing machine:
1. 在永磁除鐵機(jī)控制柜上給設(shè)備停電,并在操作按鈕上掛“有人工作禁止合閘”的停電告示牌。
1 in the permanent magnet iron removing machine control cabinet for power equipment, and on the operation button hanging on "people work f no switching power outage signs.
2. 檢修前首先要通知調(diào)度室,待帶式輸送機(jī)物料運(yùn)行停車后,方可進(jìn)行設(shè)備的檢修工作。
2 before the overhaul, we must first inform the dispatch room, after the belt conveyor is running, the equipment can be repaired.
3. 待帶式輸送機(jī)停下后,將帶式輸送機(jī)頭操作箱“就地”、“集空”主令開(kāi)關(guān)打到“停車”位置,并掛“停車牌”,以防不知情人士開(kāi)機(jī)運(yùn)作,危及維修人員人身安全。
3 to stop the belt conveyor, the belt conveyor head operation box "in place", "empty" master switch to "stop" position and hang "parking card", to prevent insider boot operation, endanger the personal safety of maintenance personnel.
4. 將除鐵機(jī)上落下的鐵器全部清理干凈,恢復(fù)除鐵器送電,摘除機(jī)頭操作箱“停電牌”將主令開(kāi)關(guān)打到“集控”就地力位置通知調(diào)度恢復(fù)生產(chǎn)。
4 in addition to iron falling iron all clean, restore the separator power supply, removal of head box "Blackout" brand will be the master switch to "control" is shown productivity position notice to resume production scheduling.